Project name
Promoter - financial intermediary
750kV Zaporizhzhia-Kakhovska Line
National Energy Company Ukrenergo
Contact point: Victor Lyssykh, Head of Investment and Credit Policy Division
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
Up to EUR 150 million.
The total project cost is estimated at around EUR 350 million.
Location
Sector(s)
Description
Objectives

Construction of (1) a 190 km long 750 kV AC transmission line, (2) a new 750/330 kV substation at Kakhovska, and (3) 330kV line interconnections into the existing 330 kV network. The project will form an important component of the future connection to the Trans-European Energy Networks (TEN-E).

The project will promote the development of the transmission electricity network in Ukraine, through the construction of a new transmission link in the South of the country, aimed at strengthening the connection of the existing network with UCTE, the European transmission system. It will allow a better utilisation of existing generation capacity as the new line will remove constraints on the operation of the Zaporizka nuclear power plant resulting in reductions in fossil fuel consumption and CO2 emissions. The project will also enable the rebalancing of the energy load and reduction of technical losses, while increasing the reliability and quality of the supply, and will cater for the future increased demand for electricity in the region.

Environmental aspects
Procurement

The promoter is in the process of providing an EIA in line with EU requirements, including public consultation. The environmental impacts that can be expected for the project schemes relate to visual impact, electromagnetic fields, vegetation clearance, noise nuisance, and disturbance during construction. The social impacts, environmental procedures and mitigation measures for the project schemes will be reviewed during appraisal.

The Bank will require that the procurement is carried out in accordance of the EIB’s Guide to Procurement, with which the promoter is familiar by reason of a previous operation with the Bank. The promoter’s procurement plans and procedures will be evaluated during the appraisal.

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

News & Stories

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications