Project name
Promoter - financial intermediary
ZILINA TEPLICKA MARSHALLING YARD
Železnice Slovenskej Republiky (ŽSR, the Slovakian Railway Infrastructure Manager)
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 15 million
EUR 119 million
Location
Sector(s)
Description
Objectives

The project aims at developing a new marshalling yard at the crossing point of two TEN-T corridors, in north-west Slovakia (a marshalling yard is a railroad yard at a freight station, used to separate railroad cars on to one of several tracks). The new marshalling yard will concentrate all of the marshalling operations from the existing yards in the area, in particular the railway station Žilina, the marshalling yard Žilina, the railway station Vrútky and the freight station Vrútky. The project will be constructed at the site of one of the existing marshalling yards.

The strategic objectives of the project are: • to ensure competitiveness of rail freight transport against other transport modes through providing effective and efficient services in train formation and marshalling operations, • to meet the parameters set by international agreements to ensure interoperability requirements, • meet technical standards which apply to marshalling yards to improve the safety of labour force involved in marshalling operations. • vacating the existing marshalling yard in the city centre of Zilina in order to make space for line geometry modification to increase track speed and to decrease the unfavourable impacts resulting from rail operation on the urban population of Žilina and Vrútky.

Environmental aspects
Procurement

The environmental approval had been obtained previously in May 2007 and the final building permit for the construction was issued in October 2008. The Feasibility Study was completed with comments from JASPERS also in 2008 and the tender design was concluded in January 2009. After the tendering procedure, a contract was awarded in May 2009 and construction works started in July 2009.

The Promoter, ŽSR is subject to and follows EU Directives on procurement procedures (in this particular case, Directive 2004/17/EC), including publication in the Official Journal of the European Union (OJEU), that have been transposed into national legislation. All contracts over the relevant EC directive thresholds have been put out to international tendering, with publication of notices in the OJEU. As usual, the Bank will include a clause to this effect in the finance contract. The contracts for the implementation of the works and engineering tasks have been tendered and awarded through open public procedures, in compliance with EU Directives, that led to the selection of the most economically advantageous offer. Under these circumstances, the procurement procedures followed by the Promoter are suitable for the project and acceptable to the Bank.

Related projects
Parent project
Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - ZILINA TEPLICKA MARSHALLING YARD
Publication Date
3 Jun 2015
Document language
Main Topic
Lending
Document Number
59481327
Document Focus
Environmental Information
Project Number
20120023
Sector(s)
Regions
Countries
Publicly available
Download now
Other links

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications