Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 906,743,692.32
    Countries
    Sector(s)
    Poland : € 906,743,692.32
    Transport : € 906,743,692.32
    Signature date(s)
    7/04/2020 : € 144,413,087.57
    26/09/2019 : € 341,911,513.3
    29/06/2021 : € 420,419,091.45
    Link to source

    Summary sheet

    Release date
    14 June 2016
    Status
    Reference
    Signed | 26/09/2019
    20160050
    Project name
    Promoter - financial intermediary
    WARSAW II METRO LINE EXTENSION
    MIASTO STOLECZNE WARSZAWA, METRO WARSZAWSKIE SP ZOO
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    PLN 4415 million (EUR 1037 million)
    PLN 8830 million (EUR 2074 million)
    Location
    Sector(s)
    Description
    Objectives

    Construction of the 16.4 km long extension of metro line II in Warsaw and 14 new stations, purchase of 37 pieces of rolling stock for metro line II, construction of depot in Mory and purchase of 22 pieces of rolling stock to replace existing ones used on the first metro line

    The project consists of extensions of the second metro line in Warsaw (the first phase was financed under two EIB operations (WARSAW II METRO LINE INFRASTRUCTURE and WARSAW METRO ROLLING STOCK) and involved the construction of the central section under the Vistula River and the city centre; this was completed recently). The second phase involves the construction of extensions on both sides of the central section; these works will start soon. It includes approximately 15 km of metro line, 14 new stations and a depot. The project also includes the acquisition of 59 new metro rolling stock units partially to increase the fleet and replacing existing obsolete trains. As with the central section, the promoter intends to use a mix of funding from the EU (Cohesion Fund), the EIB and its own resources.

    Environmental aspects
    Procurement

    The project falls under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and may therefore require an EIA. The metro extensions were screened in by the competent authority and an EIA was completed in 2014. Should any scheme have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 79/409/EEC), the Bank would require the promoter to act according to the provisions of the aforementioned directives. In addition, the arrangements for scrapping the replaced stock will be checked during appraisal.

    The Bank will require the city of Warsaw and the metro operator to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required. The tender notice for part of the works was published in OJEU 18/10/2014, number 2014/S 201-353978 and award took place at the end of 2015. Procurement of other contracts has yet to commence.

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Non-Technical Summary (NTS) - WARSAW II METRO LINE EXTENSION - Stage one_Western Section
    Publication Date
    20 Dec 2016
    Document language
    Main Topic
    Lending
    Document Number
    72713338
    Document Focus
    Environmental Information
    Project Number
    20160050
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - WARSAW II METRO LINE EXTENSION - Stage Two_Western Section
    Publication Date
    20 Dec 2016
    Document language
    Main Topic
    Lending
    Document Number
    72714513
    Document Focus
    Environmental Information
    Project Number
    20160050
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - WARSAW II METRO LINE EXTENSION - Stage one_Eastern Section
    Publication Date
    20 Dec 2016
    Document language
    Main Topic
    Lending
    Document Number
    72718845
    Document Focus
    Environmental Information
    Project Number
    20160050
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - WARSAW II METRO LINE EXTENSION - Stage Two_Eastern Section
    Publication Date
    20 Dec 2016
    Document language
    Main Topic
    Lending
    Document Number
    72701421
    Document Focus
    Environmental Information
    Project Number
    20160050
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - WARSAW II METRO LINE EXTENSION
    Publication Date
    26 Apr 2017
    Document language
    Main Topic
    Lending
    Document Number
    64603344
    Document Focus
    Environmental Information
    Project Number
    20160050
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications