Amount
€ 220,000,000
Countries
Sector(s)
Poland : € 220,000,000
Transport : € 220,000,000
Signature date(s)
23/12/2022 : € 220,000,000
Link to source
Other links

Summary sheet

Release date
7 November 2022
Status
Reference
Signed | 23/12/2022
20220467
Project name
Promoter - financial intermediary
S7 EXPRESSWAY PLONSK - CZOSNOW
MINISTRY OF INFRASTRUCTURE / GDDKIA - REPUBLIC OF POLAND
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 220 million
EUR 524 million
Location
Sector(s)
Description
Objectives

The project concerns the modernisation of the entire Expressway S7 route north of Warsaw, between Plonsk and Czosnow, complementing the existing sections on the entire North-South axis. The S7 is a major road in Poland which has been planned to run from Gda?sk, on the Baltic coast, through Warsaw and Kraków to Rabka, near the border with Slovakia.

The aim is to make the Baltic-Adriatic TEN-T corridor in Central Poland more efficient and safer, by improving connectivity and driving conditions between Warsaw and Gdansk. Adapting the road technical and operational parameters to the traffic forecasts, will remove bottlenecks, as well as benefit the population's living around.

Additionality and Impact

The Project concerns construction of a 34.6 km long S7 Expressway section between Plonsk and Czosnow and will contribute to the efficiency of the Baltic - Adriatic TEN-T corridor in Central Poland by improving connectivity between Warsaw and Gdansk. The Project includes the modernization of one but last section along the S7 route north of Warsaw to an expressway standard and complement already constructed expressway sections on the entire North - South axis between Gdansk and the border of Slovakia. The Project will contribute to the adapting of the technical and operational parameters of the road to the forecast traffic level, by removing bottlenecks, completing missing elements of a safe road infrastructure and improving driving conditions. The Project will also contribute to the reduction of safety related negative externalities and improve living conditions for inhabitants alongside the road. The terms and conditions of the EIB loan, notably in terms of long tenor (up to 30 years), appropriate disbursement conditions and advantageous financial terms will increase the financial flexibility and investment capacity of the Promoter and will be complementary to the EU grants and national financing. The Bank's contribution will therefore facilitate the completion of the Project on favourable terms and in a timely manner.

Environmental aspects
Procurement

The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending the EIA Directive 2011/92/EU, requiring a full environmental impact assessment (EIA) procedure. EIA studies were completed in 2015 and in February 2016 the Regional Director for Environment (RDOS) issued an Environmental Decision. It was challenged by the Mayor of Zaluski to the higher instance General Director for Environment (GDOS), who in February 2017 issued a Decision, modifying several paragraphs in the RDOS decision, while upholding the rest of it. This Decision imposed that, following the design phase, the developer shall carry out a Supplemental EIA (SEIA), allowing the Competent Authority to define detailed environmental requirements, as part of the process for obtaining the Development Permit. Design and Supplemental EIA studies were completed in 2021 and are under review by the Competent Authority at a time of pre-appraisal. Taking into consideration that the project alignment crosses environmentally sensitive area (Valley of Central Vistula). Although the project follows the existing alignment of the road, particular attention during the appraisal will be on compliance with environmental and social standards and, in particular, on foreseen measures for mitigating any potential negative impact on NATURA 2000 site specific conservation objectives.

Procurement process is completed, with tenders launched in 2019 and three "design and build" type of works contracts and one supervision contract being signed in 2020. The EIB will verify that contracts for implementation of the project are tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
Under appraisal
Approved
Signed
8 December 2022
23 December 2022
Related documents
Link to source
Other links

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Impact Assessment (ESIA) - S7 EXPRESSWAY PLONSK - CZOSNOW - Raport oddziaływaniu na środowisko - section III Modlin - Czosnow
Publication Date
26 Nov 2022
Document language
Main Topic
Lending
Document Number
164612476
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S7 EXPRESSWAY PLONSK - CZOSNOW - Aneks nr 1 do raportu oddziaływaniu na środowisko - Płońsk – Czosnów
Publication Date
26 Nov 2022
Document language
Main Topic
Lending
Document Number
159455196
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S7 EXPRESSWAY PLONSK - CZOSNOW - Uzupełnienie aneksu nr 1 do raportu o oddziaływaniu na środowisko - Płońsk – Czosnów
Publication Date
26 Nov 2022
Document language
Main Topic
Lending
Document Number
159454211
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S7 EXPRESSWAY PLONSK - CZOSNOW - Raport oddziaływaniu na środowisko - Płońsk – Czosnów
Publication Date
24 Nov 2022
Document language
Main Topic
Lending
Document Number
159452968
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S7 EXPRESSWAY PLONSK - CZOSNOW - Streszczenie w języku niespecjalistycznym - sec III Modlin-Czosnów
Publication Date
26 Nov 2022
Document language
Main Topic
Lending
Document Number
164632199
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S7 EXPRESSWAY PLONSK - CZOSNOW - Raport o oddziaływaniu przedsięwzięcia na środowisko - Zaluski-Modlin - Aneks
Publication Date
7 Dec 2022
Document language
Main Topic
Lending
Document Number
165023833
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S7 EXPRESSWAY PLONSK - CZOSNOW - Raport o oddziaływaniu przedsięwzięcia na środowisko - Zaluski-Modlin
Publication Date
7 Dec 2022
Document language
Main Topic
Lending
Document Number
165011181
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S7 EXPRESSWAY PLONSK - CZOSNOW - Raport o oddziaływaniu na środowisko - Siedlin Zaluski
Publication Date
9 Dec 2022
Document language
Main Topic
Lending
Document Number
159469069
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S7 EXPRESSWAY PLONSK - CZOSNOW - Raport o oddziaływaniu na środowisko - streszczenie w języku niespecjalistycznym - Zaluski-Modlin
Publication Date
9 Dec 2022
Document language
Main Topic
Lending
Document Number
165089482
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S7 EXPRESSWAY PLONSK - CZOSNOW - Raport o oddziaływaniu na środowisko - streszczenie w języku niespecjalistycznym - sec I Siedlin Zaluski
Publication Date
9 Dec 2022
Document language
Main Topic
Lending
Document Number
165089853
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Data Sheet (ESDS) - S7 EXPRESSWAY PLONSK - CZOSNOW
Publication Date
21 Dec 2022
Document language
Main Topic
Lending
Document Number
157822763
Document Focus
Environmental Information
Project Number
20220467
Sector(s)
Regions
Countries
Publicly available
Download now
Link to source

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications