Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

Signature(s)

Amount
€ 180,000,000
Countries
Sector(s)
Portugal : € 180,000,000
Industry : € 180,000,000
Signature date(s)
9/04/2024 : € 180,000,000
Link to source

Summary sheet

Release date
6 August 2024
Status
Reference
Signed | 09/04/2024
20230533
Project name
Promoter - financial intermediary
SINES GREEN HYDROGEN PRODUCTION
GALP ENERGIA SGPS SA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 180 million
EUR 249 million
Location
Sector(s)
Description
Objectives

The project will finance the implementation and operation of a very large-scale, grid-connected electrolyser (100 MW) producing renewable hydrogen to be supplied to a refinery.

The aim is to support the EU and national climate, renewable and hydrogen targets for 2030, in line with the National Energy and Climate Plan, by producing electrolytic hydrogen based on renewable energy to be used in transport.

Additionality and Impact

The project concerns the development, implementation and operation of a large-scale hydrogen production plant in Sines, south of Portugal.

 

The project contributes to the Bank's lending priority objectives on Energy (Renewable Energy), the transversal objectives on Climate Action (mitigation) and Economic and Social Cohesion. The project will displace fossil fuel-based hydrogen by hydrogen from electrolysis based on existing renewable electricity capacity aiming to align with the EU Taxonomy requirements. It contributes to meeting national and EU renewable energy targets in transport as well as to the objectives of the Portuguese National Integrated Energy and Climate Plan (NECP) 2030 as regards electrolyser capacity, with a target of 5.5 GW. The project underpins the goals of the national and EU Hydrogen Strategies and the RePowerEU plan objectives.

 

The project will thus address the market failure of negative climate and environmental externalities, through the reduction of carbon emissions. Further, the project could be considered to marginally contribute to knowledge externalities with the scale-up of the electrolyser's supply chain, implementing one of the currently largest electrolyser units being realised in the EU.


The project is considered of strategic interest for Portugal within the framework of the EU's Renewable Energy Directive (RED II), the National Energy and Climate Plan (PNEC 2030) and the national Roadmap for Carbon Neutrality (RNC 2050). The project is located in a Less Developed Region of Portugal (Alentejo), thus supporting the Bank's priority policy on Economic and Social Cohesion.


The Bank's financial contribution is considered valuable to the client, as the EIB's offering is more favourable than other market alternatives under various dimensions (e.g. longer tenor, availability and grace periods, convertible or revisable rates). The EIB loan will further contribute to the diversification of the Borrower's financing sources from commercial sources as well as the capital markets.

Environmental aspects
Procurement

Hydrogen (H2) modules of the project fall under Annex II of the Environmental Impact Assessment (EIA) directive and are subject to the Seveso Directive (lower-tier). H2 production needs to be aligned with the sustainability of relevant EU directives and regulations, incl. the threshold for substantial contribution to climate mitigation, set by the EU Taxonomy, and the EU criteria for additionality, renewability, and the temporal, geographical correlation of the electricity supply to the H2 electrolyser.

The project will be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC c.q. 2014/25/EU hence private sector procurement procedures will apply. Equipment and works are expected to be purchased through several contracts for installation and infrastructure of components.

Milestone
Under appraisal
Approved
Signed
6 February 2024
9 April 2024
Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - SINES GREEN HYDROGEN PRODUCTION
Publication Date
7 Aug 2024
Document language
Main Topic
Lending
Document Number
178705742
Document Focus
Environmental Information
Project Number
20230533
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - SINES GREEN HYDROGEN PRODUCTION - Link to EIA report
Publication Date
9 Aug 2024
Document language
Main Topic
Lending
Document Number
226662863
Document Focus
Environmental Information
Project Number
20230533
Sector(s)
Regions
Countries
Publicly available
Download now

News & Stories

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications