Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 20,000,000
    Countries
    Sector(s)
    Italy : € 20,000,000
    Water, sewerage : € 20,000,000
    Signature date(s)
    3/05/2024 : € 20,000,000

    Summary sheet

    Release date
    15 April 2024
    Status
    Reference
    Signed | 03/05/2024
    20230754
    Project name
    Promoter - financial intermediary
    VALLE UMBRA WATER SECTOR UPGRADE- GREEN LOAN
    VALLE UMBRA SERVIZI SPA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 35 million
    EUR 106 million
    Location
    Sector(s)
    • Water, sewerage - Water supply; sewerage, waste management and remediation activities
    Description
    Objectives

    The project concerns VUS's 2023-2028 water and wastewater investment programme, aimed at improving system resilience through interconnections of the water distribution networks, new water sources, and leakage reduction as well as optimisation of existing sewerage treatment facilities.

    The aim is to support the promoter's investments (e.g. water and wastewater treatment plants, sewerage networks, and energy efficiency) in the Italian region of Umbria.

    Additionality and Impact

    The Project is in line with the InvestEU objective of Environment and Resources. The Project will support investments in water and wastewater infrastructure in the Umbria Region in Italy, by improving the coverage and quality of integrated water services, and bringing operational efficiency improvements, as well as increasing resilience towards droughts. In doing so, it will also ensure compliance with key European regulations in the water sector. Being located in Umbria, a transition cohesion region in Italy, the Project will contribute to the EU's economic social and territorial cohesion.

    The Project will contribute to the Bank's policy objectives of Sustainable Energy and Natural Resources as well as Climate Action and Environmental Sustainability. The Project will address a number of market failures, including those associated with public goods, unaccounted for externalities and information failures, generating positive health, environmental benefits and water security (including resilience against climate change), which would not be realised to the same extent without public intervention.

    Given the counterpart's relatively small size and low capital levels, the EIB would not be able to provide financing support to the same extent without InvestEU. The EIB support is expected to bring a tangible value added by lowering the project's cost of funding and offering a tenor longer than the one normally proposed by other financers. Moreover, the Bank is providing an important technical contribution through an advisory assignment for the development of the Promoter's decarbonisation plan. Considering the magnitude of the Project's funding needs, it is expected that the EIB support will contribute to accelerate its implementation.

    Environmental aspects
    Procurement

    The upgrade of water and wastewater infrastructure brings positive environmental impacts. Compliance with the EU Water Framework Directive (2000/60/EC), Urban Waste Water Treatment Directive (91/271/EEC) and EU and national environmental legislation, notably under the environmental impact assessment (EIA) Directive 2011/92/EU (amended by the Directive 2014/52/EU), Birds Directive (2009/147/EC) and Habitats Directive (92/43/EEC) will be verified during appraisal. The Project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation and mitigation, as well as water resources protection. This Project also brings substantial health advantages and environmental quality improvements to the affected population, thereby increasing the quality of life in the project area. Social negative impacts are only temporary (e.g. occupation of public and private space, safety hazards during construction, traffic, noise) and will be addressed as part of the planning for the implementation of each scheme. The Promoter has demonstrated sound practices concerning to environmental, health and safety management. As per social matters, the promoter will also be requested to comply with the relevant applicable legislation.

    The promoter has to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/23/EU and/or 2014/24/EU and/or 2014/25/EU where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Milestone
    Under appraisal
    Approved
    Signed
    11 April 2024
    3 May 2024
    Related projects
    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - VALLE UMBRA WATER SECTOR UPGRADE- GREEN LOAN
    Publication Date
    17 Apr 2024
    Document language
    Main Topic
    Lending
    Document Number
    188690655
    Document Focus
    Environmental Information
    Project Number
    20230754
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications