Release date: 8 April 2002
Promoter – Financial Intermediary
Comunidad Autónoma de NavarraLocation
Description
Construction of a shadow toll road between Pamplona and Logroño.
Objectives
The project will reduce the traffic congestion at regional level and improve road safety and traffic conditions for transit traffic of the whole area connecting the cities of Pamplona and Logroño.
Sector(s)
Proposed EIB finance (Approximate amount)
Approximately EUR 150 m
Total cost (Approximate amount)
Estimated cost of EUR 300 m
Environmental aspects
The promoter is required to respect the regulations imposed by the Directive 97/11/EC. An Environmental Impact Assessment has been realised. In accordance with its normal procedure, the Bank will ensure that appropriate measures have been taken as regards environmental protection; in particular special measures for impact mitigation have been clearly identified during the design process.
Procurement
The project was advertised in the Official Journal of the EU on 15th March 2002 in accordance with Directive 93/37/CEE. It is expected that the concession contract will be awarded before summer 2002.
Status
Signed - 17/10/2002