Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20020446
    Release date: 30 May 2003

    Promoter – Financial Intermediary

    Comunidad Autónoma de Castilla La Mancha ( CACLM).

    Location

    Description

    The project consists of the construction of a new shadow toll motorway between Toledo and Tomelloso in the region of Castilla-La Mancha, an objective 1 region. Total length is some 127 km.

    Objectives

    Contribute to regional development through the improvement of road communications within Castilla-La Mancha.

    Comments

    Roads.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to 50% of the total project cost.

    Total cost (Approximate amount)

    Under evaluation

    Environmental aspects

    The promoter is required to adhere to the requirements of EU Directive 97/11/EC. The normal appraisal procedure of the Bank will ensure that appropriate measures are foreseen with regard to protection of the environment.

    Procurement

    Compliant with EU Directives.

    Status

    Signed - 29/07/2004

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Spain Transport