Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20080629
Release date: 1 March 2010

Promoter – Financial Intermediary

Karen Demirchyan Yerevan Metro CJSC

Location

Description

Emergency investments in Yerevan Metro, covering immediate rehabilitation needs, including security upgrades. The project consists of the addressing the problem of the water ingress into the metro tunnels, modernisation of the infrastructure and refurbishment of the rolling stock.

Objectives

Ensuring the safe functioning of the Yerevan metro system, providing comfortable level of service.

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 10 million.

Total cost (Approximate amount)

EUR 30 million.

Environmental aspects

The project has to meet the environmental and social requirements of the Bank based on EU policy and is expected to contribute to the overall improvement of the urban environment, through reduced noise and vibration and improved occupational health and safety at work in metro.

Procurement

The project has to comply with the basic principles of the EU policy on procurement. The Promoter is subject to the EIB Guide to Procurement procedures. Consultancy services are required to assist the Promoter in the procurement process.

Status

Signed - 10/08/2010

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Armenia Transport