Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20090227
Release date: 25 October 2010

Promoter – Financial Intermediary

City of Torun

Location

Description

The project consists of the construction of a bridge and access roads on the Vistula river in the new course of National Road No 1 in Torun, which is part of the trans-European Transport Network, joining it with National Roads No 15 and No 80 in the section from Daszyńskiego Square to Łódzka Street. The total length of the new route is about 4.1 km.

Objectives

The realisation of the project should permit to alleviate the current high traffic pressure on the only existing bridge and on the connected infrastructure on either side of the river, reducing traffic emissions and noise, while improving safety.

Sector(s)

Proposed EIB finance (Approximate amount)

Up to PLN 440 million. (ca. EUR 114 million.)

Total cost (Approximate amount)

Up to PLN 1 billion. (ca. EUR 250 million.)

Environmental aspects

Poland, as a Member State, is obliged to follow the relevant EU rules in relation to the environmental impact of projects (namely SEA, EIA and Habitat/Natura 2000 Directives). The new EIA Polish law, which is fully compliant with EU Directives, entered into force in November 2008. The present project is a new road connection, falling under Annex I of the EIA Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC, therefore a full EIA has been carried out. Details will be checked at appraisal stage.

Procurement

The promoter is a public entity subject to EU public procurement regulations. The Bank will require the promoter to ensure that contracts for the implementation of the Project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (mainly Directive 2004/17/EEC) with parallel publication of tender notices in the EU Official Journal, as and where appropriate. All the details will be checked at appraisal stage.

Status

Signed - 17/12/2010

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Poland Transport