Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20090485
    Release date: 4 May 2010

    Promoter – Financial Intermediary

    Ukrhydroenergo

    Location

    Description

    The multi-component project will refurbish and upgrade 21 conventional and pumped storage hydro power plant units at six power stations along River Dnieper in central Ukraine and is part of larger, long-term programme of the promoter, aimed at refurbishing all 100 units of their nine hydro power plants. The project is co-financed with World Bank and EBRD.

    Objectives

    The programme will refurbish and upgrade 21 hydro power plant units situated in central Ukraine on the Dnieper River to extend the economical lifetime of these renewable energy assets.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 200 million

    Total cost (Approximate amount)

    EUR 467 million

    Environmental aspects

    The environmental impacts of the project are evaluated acceptable, as the proposed Environmental and Social Management and Mitigation Plan (ESMMP) is implemented.

    Procurement

    The Bank will require that the procurement is carried out in accordance of the EIB’s Guide to Procurement.

    Status

    Signed - 21/09/2012

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Ukraine Energy