Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20110295
Release date: 18 June 2012

Promoter – Financial Intermediary

Romanian National Company of Motorways and National Roads (RNCMNR)

Location

Description

Rehabilitation of a 130 km section on the existing alignment of the National Road 6 (NR6) between Alexandria and Craiova and construction of two bypasses with a total length of 24 km.

Objectives

Rehabilitation of National Road 6 between Alexandria and Craiova

Comments

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 44 million

Total cost (Approximate amount)

EUR 146 million

Environmental aspects

The project falls within the Annex II of the Directive 2011/92/EU on Environmental Impact Assessment (EIA) for which the EIA is not mandatory. The competent authority-National Environmental Protection Agency (NEPA)-has issued an environment agreement on 25.05.2009. One of the sections of the project, the existing bridge across the Olt River, is located inside the Natura 2000. The Ministry of Environment – competent Authority for the Natura 2000 - issued a confirmation (Form A, 03.10.2008) stating that the project is unlikely to have any significant impact on existing protected areas. Further aspects are to be assessed during appraisal.

Procurement

The promoter is a publicly owned company subject to the provisions of the public procurement Directive 2004/18/EC, as transposed into Romanian law. Procurement commenced in December 2010 with relevant announcements being published in Romania and transmitted for publication in the EU Official Journal. The tender procedure and award of contracts will be reviewed during appraisal.

Status

Approved - 24/07/2012

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Romania Transport