Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20120391
Release date: 26 July 2016

Promoter – Financial Intermediary

Bucharest Municipality

Location

Description

Finalisation of Glina wastewater treatment plant, rehabilitation of the main sewer collectors and of Dambovita sewer collector canal (CASETA)

Objectives

To have adequate treatment of the entire wastewater flow from the city at levels that comply with EU Directives, to reduce the level of infiltration rate in the sewer network and to have a sustainable solution for processing the entire sewage sludge production.

Sector(s)

  • Water, sewerage - Water supply; sewerage, waste management and remediation activities

Proposed EIB finance (Approximate amount)

EUR 75 million

Total cost (Approximate amount)

EUR 353 million

Environmental aspects

The project is strongly environmentally driven and therefore has predominantly positive effects on the environment. The assessment pursuant to SEA Directive 2001/42/EC and to respective national GD1076/2004 was carried out for the overall Operational Programme. The project was subject to Environmental Impact Assessment (EIA) screening (screened in), and subsequently to the environmental impact assessment pursuant to Directive 2011/92/EC and respective national GD 445/2009. The Environmental Agreement was issued in 01/2013. Separate assessments were carried out for effects on the sites in NATURA 2000 network (pursuant to Habitats Directive 92/43/EEC and Birds Directive 2009/147/EC). The project is unlikely to have significant negative effects on the protected areas and sites.

Procurement

The Bank will require the promoter to ensure that contracts for the implementation of the project have been and shall be tendered in accordance with the relevant applicable EU procurement legislation (i.e. Directive 2014/24/EU as well as Directive 2007/66/EC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Status

Signed - 8/11/2017

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Romania Water, sewerage