Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20140344
Release date: 16 July 2014

Promoter – Financial Intermediary

BUNDESREPUBLIK DEUTSCHLAND

Location

Description

The project concerns the widening of a 29.2km A-7 motorway section in Lower Saxony between Salzgitter and Göttingen from 2x2 to 2x3 lanes. The project also includes the maintenance and operation of the total 71.6 km long section between Salzgitter and Göttingen.

Objectives

The main project economic benefits will stem from reduced travel times and improved road safety thanks to enhanced road capacity. Likewise vehicle operating costs for road users are expected to decrease.

Comments

The project cost is not disclosed as it is subject to an ongoing European wide tender procedure.

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 213 million

Total cost (Approximate amount)

Not disclosed.

Environmental aspects

The project falls under Annex I of the EIA Directive 2011/92/EC. Compliance with the SEA Directive 2001/42/EC, EIA Directive 2011/92/EU, Habitats Directive 92/43/EEC and Birds Directives 2009/147/EC will be reviewed at appraisal.

Procurement

The project is being procured in accordance with Directives 2004/18/EC and 2007/66/EC through a negotiated procedure after pre-qualification, with international publication in the Official Journal of the EU (OJEU). The contract notice was published on the 11th April 2014, ref 2014/S 72-123291.

Status

Signed - 11/04/2017

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Germany Transport