Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20140566
Release date: 27 January 2015

Promoter – Financial Intermediary

PUBLIC ENTITY(IES)

Location

Description

Widening of a 25.5km section of the A6 motorway between Wiesloch-Rauenberg and Weinsberg (south of Heidelberg, north of Stuttgart) and maintenance of the overall section of 47.1km under a 30-year concession design, build, finance and operate contract (DBFO).
The project includes a 1.3km viaduct which crosses the Neckar Valley.

Objectives

The main economic benefits will stem from reduced travel times and improved road safety thanks to enhanced road capacity.

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 250 million

Total cost (Approximate amount)

Not disclosed.

Environmental aspects

The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EC. Compliance with the Strategic Environmental Assessment (SEA) directive 2001/42/EC, EIA Directive 2011/92/EU, Habitats Directive 92/43/EEC and Birds Directive 79/406/EEC will be reviewed at appraisal.

Procurement

The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Status

Signed - 20/12/2016

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Germany Transport