Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20150773
    Release date: 19 April 2017

    Promoter – Financial Intermediary

    JAVNO PREDUZECE AUTOCESTE FBIH DOO

    Location

    Description

    Construction of about 20.9 km motorway between Pocitelj and Mostar in the Southern part of Bosnia and Herzegovina.

    Objectives

    The project is part of the trans-European Corridor Vc, which connects the Croatian coast to Budapest through Bosnia and Herzegovina and forms part of the South-Eastern axis of the extension of the TEN-T network to neighboring countries. Corridor Vc is the main north-south corridor running through Bosnia and Herzegovina. The project is expected to facilitate trade, develop tourism, promote regional and national economic growth and ultimately contribute to economic and social cohesion in the region. The project is therefore eligible under Art 309 (c).

    Sector(s)

    Under ELM Guarantee

    This operation is covered by the ELM Guarantee.

    Proposed EIB finance (Approximate amount)

    EUR 144 million

    Total cost (Approximate amount)

    EUR 227 million

    Environmental aspects

    If located in the EU, the project, consisting of the construction of a new Greenfield motorway, would fall under Annex I of the EIA Directive 2011/92/EU and therefore require a full Environmental Impact Assessment (EIA) including public consultations. In the Federation of Bosnia and Herzegovina it falls under the EIA procedure as stipulated by the Law on Environmental Protection and pertaining regulation of Bosnia and Herzegovina. The promoter has already provided an EIA study for the project carried out in accordance to the above-mentioned legal framework. Its content and compliance with the principles of the relevant EU directives on SEA, EIA and Nature conservation will be reviewed during appraisal.

    Procurement

    The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's guide to procurement and the relevant applicable EU public procurement rules.

    Status

    Signed - 26/04/2018

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Bosnia and Herzegovina Transport