Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20170086
Release date: 30 September 2019

Promoter – Financial Intermediary

SOCIETÉ NATIONALE D'EXPLOITATION ET DE DISTRIBUTION DES EAUX SA

Location

Description

The project aims to secure drinking water supply in Greater Tunis through the construction of a water treatment plant in Béjaoua and related infrastructure, including water pipes for the financial port of Tunis.

Objectives

In order to meet the drinking water needs of the Greater Tunis area during peak periods until 2030, EIB and Agence française de développement (AFD) will support SONEDE, Tunisia's national water utility company, to implement a program aiming to strengthen and secure the water supply of the Greater Tunis that includes the following elements: - Construction of a water pumping station and a drinking water treatment plant in Béjaoua with a capacity of 4 m3/s; - Supply of 52.2km of pipes for the transfer of treated water; and - Construction of six reservoirs with a capacity of 10,000 m3 each.

Comments

Each of EIB and AFD will provide two distinct loans to the Republic of Tunisia and to SONEDE to finance the project. The project will be covered by a first demand guarantee issued by the Republic of Tunisia, for the EIB loan granted to SONEDE to finance the Béjaoua Station. SONEDE is expected to finance the construction of the Bejaoua Station (est. project costs of EUR 50m, taxes excluded). The Republic of Tunisia is expected to finance the Tunis Financial Harbour components (est. project costs of EUR 29m, taxes excluded).

Sector(s)

  • Water, sewerage - Water supply; sewerage, waste management and remediation activities

Under ELM Guarantee

This operation is covered by the ELM Guarantee.

Proposed EIB finance (Approximate amount)

EUR 38 million

Total cost (Approximate amount)

EUR 79 million

Environmental aspects

The proposed investment will focus on increasing the capacity of the water supply facility for the Grand Tunis area (production, transport and storage). Where required, full Environmental and Social Impact and Assessments (ESIAs) will be carried out as well as any required environmental and social management plans (ESMPs). Details will be assessed during appraisal.

Procurement

EIB will require the promoter to ensure that implementation of the project will be done in accordance with the EIB Guide to Procurement.

Status

Signed - 21/10/2020

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Tunisia Water, sewerage