Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20170936
Release date: 3 April 2019

Promoter – Financial Intermediary

SOCIETE WALLONNE DE FINANCEMENT COMPLEMENTAIRE DES INFRASTRUCTURES

Location

Description

The project, part of the SOFICO 2018-2022 Investment Programme, includes the renewal and enlargement of the Ampsin-Neuville inland waterway lock complex along the Meuse river as well as the improvement and resurfacing of various sectors of the E-411 and N5 roads in Wallonia, all of which are part of the Trans-European Transport Network (TEN-T) North Sea-Mediterranean Corridor.

Objectives

The new lock complex will improve the navigation conditions on the Meuse which will be navigable for Class VIb convoys between Namur and Liège after the project is completed. This project component is the last part of an extensive investment plan executed over the past 10 years to upgrade this waterway section. The road rehabilitation projects on E411 and N5 are expected to improve safety and reduce vehicle operating costs. The capacity of the E411 will be expanded from four to six lanes over 16km which will bring time savings to the users.

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 200 million

Total cost (Approximate amount)

EUR 599 million

Environmental aspects

The project component "renewal of the lock complex at Ampsin-Neuville along the Meuse" falls under Annex I of the Environmental Impact Assessment (EIA) Directive, thus requiring a full EIA. Compliance of the overall project scope, with the Strategic Environmental Assessment (SEA) Directive 2001/42/EC, the EIA Directive 2011/92/EU, the Habitats Directive 92/43/EEC, the Birds Directive 2009/147/EC, the Water Framework Directive 2000/60/EC (as amended) is required and will be checked in detail during the appraisal, as well as biodiversity assessment requirements, climate change adaptation issues, mitigation/compensation measures and environmental and social monitoring plans.

Procurement

The Bank will require the promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/24/EU where applicable as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

Status

Signed - 18/10/2019

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Belgium Transport