Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20190784
    Release date: 12 May 2020

    Promoter – Financial Intermediary

    SYNDICAT INTERDEPARTEMENTAL POUR L'ASSAINISSEMENT DE L'AGGLOMERATION PARISIENNE

    Location

    Description

    The project constitutes the continuation of the investment program of the SIAAP (INTERDEPARTMENTAL SYNDICATE FOR THE SANITATION OF THE PARIS AGGLOMERATION) for the upgrading of the largest wastewater treatment plant in the Paris region (Achères Seine Aval).

    Objectives

    The project targets improved wastewater treatment and sludge treatment through the rehabilitation and upgrading of the primary settlers and the biogas plant in SIAAP's largest wastewater treatment plant with a capacity of 1.5 million cubic meters per day (combined flow of wastewater and storm water), as well as the construction of a large trunk sewer to prevent discharge of untreated sewage to Seine river.

    Sector(s)

    • Water, sewerage - Water supply; sewerage, waste management and remediation activities

    Proposed EIB finance (Approximate amount)

    EUR 250 million

    Total cost (Approximate amount)

    EUR 1000 million

    Environmental aspects

    The project aims at maintaining compliance with the Urban Wastewater Treatment Directive 91/271/EC and Water Framework Directive 2000/60/EC. Several of the construction schemes included in the project might fall under Annex I of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU. Environmental Impact Assessment procedures are carried out where required by the competent authorities and mitigating measures are applied as appropriate. Where appropriate, the requirements of the Habitats and Birds Directives (92/43/EEC and 2009/147/EC) are applied. The Bank's appraisal will focus on the Promoter's environmental management capacity to properly apply these EU Directives.

    Procurement

    The promoter has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU), with publication of tender notices in the EU Official Journal, as and where required.

    Status

    Signed - 10/12/2020

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    France Water, sewerage