Release date: 14 March 2023
Promoter – Financial Intermediary
Not disclosed.Location
Description
The project concerns the construction and deployment of a submarine cable system in the black sea interconnecting Europe with the Caucasus (Poti, Georgia) and then Armenia through an existing terrestrial infrastructure to be upgraded. The system will be operated on an open access basis , subject to local regulations, it will have a total length of 1 163km.
Objectives
The main objective of the project is to provide connectivity between Europe and South Caucasus with higher quality of service (lower latency) and high capacity.
Sector(s)
- Telecom - Information and communication
Proposed EIB finance (Approximate amount)
EUR 20 million
Total cost (Approximate amount)
EUR 45 million
Environmental aspects
In general, the deployment of telecommunication infrastructures have limited environmental effects, apart from minor disturbances during construction, which can be properly mitigated by applying industry-standard measures. For the specific case of submarine cables, the cable landings are usually subject to environmental studies for their approval. This can vary depending on the jurisdiction. As per the assessment performed within the EU, where and if applicable, the requirements of the Environmental Impact Assessment Directive (EIA) 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC or the equivalent national regulation will be verified during appraisal.
Procurement
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.
Status
Under appraisal - 4/08/2022
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).