Reference: 20210681
Release date: 4 October 2024

Promoter – Financial Intermediary

AUTORITA DI SISTEMA PORTUALE DEL MAR TIRRENO SETTENTRIONALE

Location

Description

The project concerns the development of a new port area by expanding the existing facilities towards the sea, including new breakwaters, land reclamation and dredging works at the Port of Livorno.

Additionality and Impact

The Project will improve the competitive position of maritime transport by enabling modal shift from more carbon intensive modes and enhancing interoperability between transport modes. These actions will reduce GHG emissions as well other negative transport externalities, which would otherwise be incurred by non-users, for instance from noise and local emissions. In terms of technical advice, the EIB will help to ensure that the Project will be implemented in line with the required environmental and procurement standards. EIB brings excellent financial contribution in terms of longer maturity, flexibility of drawdowns, longer availability period and the substantial crowding-in effect to the market players in this industry sector.

Objectives

The Promoter's large investment programme aims at developing the existing port facilities to increase the capacity, improve the efficiency and enhance the maritime accessibility. This programme includes the construction of a new breakwater and channel system to accommodate future terminals and upgrade the maritime accessibility. EIB's financing will be focused on Phase 1 of this investment programme, which includes the new North breakwater (and an associated basin to deposit dredging spoils), the re-profile of the existing Meloria Breakwater, the new south Breakwater and the dredging of the access channel to new and the existing port areas.

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 90 million

Total cost (Approximate amount)

EUR 473 million

Environmental aspects

Compliance with the Strategic Environmental Assessment (SEA) 2001/42/EC, the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU), the Habitats Directive 92/43/EEC, the Birds Directive 2009/147/EC, the Water Framework Directive 2000/60/EC, as well as biodiversity assessment requirements, climate change adaptation and mitigation issues, mitigation/compensation measures and environmental and social monitoring plans, will be assessed in detail during appraisal for each project component.

Procurement

The promoter shall ensure that contracts for implementation of the Project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Status

Signed - 15/07/2024

Milestone
Under appraisal
Approved
Signed
18 June 2024
15 July 2024

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).