    Reference: 20240176
    Release date: 30 October 2024

    Promoter – Financial Intermediary

    ARETI SPA

    Location

    Description

    The project concerns the promoter's investment plan 2024-2027 for the modernisation and extension of the electricity distribution network in the municipality of Rome and Formello.

    Objectives

    The aim is to replace obsolete infrastructure with modern and more efficient components to improve the electricity network resilience to climate events, ensure the overall stability and reliability of the distribution system as well as reduce the risk of supply interruptions. Such investments in the electricity network having a long-term economic lifetime will contribute to reduce GHG emissions by enabling the connection on new renewable energy sources, and the electrification of the economy based on low carbon energy, as per EU and national long-term climate and energy policies.

    Sector(s)

    • Energy - Electricity, gas, steam and air conditioning supply

    Proposed EIB finance (Approximate amount)

    EUR 500 million

    Total cost (Approximate amount)

    EUR 1232 million

    Environmental aspects

    The due diligence will focus on the promoter's capacity and capability to implement the investments in line with EIB environmental and social standards and requirements. Some investment schemes may fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU). However, the schemes to be financed have an operating voltage which is below the threshold for the screening set out in the national legislation as per the provisions of Article 4(3) of the EIA Directive.

    Procurement

    The EIB will require the promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/E as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Status

    Signed - 28/10/2024

    Milestone
    Under appraisal
    Approved
    Signed
    16 October 2024
    28 October 2024

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).