    Signature(s)

    Montant
    145 000 000 €
    Pays
    Secteur(s)
    Espagne : 145 000 000 €
    Énergie : 145 000 000 €
    Date(s) de signature
    11/07/2019 : 145 000 000 €
    Lien vers la source

    Fiche récapitulative

    Date de publication
    8 mai 2019
    Statut
    Référence
    Signed | 11/07/2019
    20180584
    Nom du projet
    Promoteur – Intermédiaire financier
    IBERDROLA NUNEZ DE BALBOA PV
    IBERDROLA SA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 145 million
    EUR 290 million
    Lieu
    Secteur(s)
    • Énergie - Electricity, gas, steam and air conditioning supply
    Description
    Objectifs

    The project consists of the financing of the Nunez de Balboa photovoltaic (PV) Plant (391 MWac) located in the Spanish region of Extremadura.

    The proposed operation aims at financing a 426 MW solar PV plant in the Spanish region of Extremadura (convergence region). As requested by the client, the operation will be labeled as EIB Green Loan, as it is fully eligible under the Climate Awareness Bond (CAB) programme. Iberdrola is one of the most relevant players in the Green Bond market and has for long time requested the EIB to provide green labelling to its financial toolkit whenever possible, given the Bank's very high standards in terms of environmental protection and climate action as well as its prominent role in the Sustainable Financing market via the CAB programme. The operation will be structured as a senior loan to Iberdrola Financiación S.A., the financial subsidiary of the Group, with a parent guarantee provided by Iberdrola S.A., in line with previous operations with the counterpart.

    Aspects environnementaux
    Passation des marchés

    The plant and its ancillary infrastructure (including the 12km EHV transmission line) are included in the Annex II of the Environmental Impact Assessment (EIA) Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), being screened in by the competent authority. Therefore, an EIA had to be performed. The projects, including the extra high voltage (EHV) transmission line, have already obtained the necessary environmental authorisation (Resolucion de la direccion General de Calidad y Evaluacion Ambiental y Medio Natural) in November 2017. The authorisation procedure and compliance with EU EIA, Birds and Habitats directives will be assessed in detail at the appraisal, in particular for what concerns cumulative impacts and impacts on protected flora and fauna, including any Natura 2000 site. The project site land (of approximately 943 Hectares) has been already fully secured through a 25-year lease agreement, whereas land acquisition process of the land required for the transmission line is awaiting a Declaration of Public Utility by the relevant authority and expropriation may be needed. Land acquisition procedures will be further assessed at appraisal, to ensure full compliance with the Bank's Environmental and Social Standards. The main commercial risk for the project will be the uncertainty on the revenues, which will depend on: (i) the final terms and conditions of the Power Purchase Agreement (PPA), (ii) the residual exposure to the wholesale market prices and (iii) the intrinsic uncertainty associated with the production of PV plants. Those elements will be assessed in detail at the appraisal. Other risks, to be further assessed at the appraisal, will be: (iv) delay during implementation (v) environmental risks connected with a project of such extension

    The promoter is a public utility operating in a liberalised market and the project has not applied to any subsidy or participated in renewable energy auctions and, therefore the project is subject to a private procurement regime. The public tenders for the supply of the main equipment and services have been already ran and awarded. The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU and 2014/25/EU, where applicable, as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required. The project has almost completed its permitting phase: the Construction Permits have been obtained from the competent municipalities in June and July 2018, whereas the Administrative Authorisation (Autorizacion Administrativa de Costruccion y Declaracion de Utilidad Publica) is expected by the end of 2018. The project has also been granted grid connection pre-authorisation (contestacion de acceso y remision) in May 2018. As for the environmental aspects, the plant and its ancillary infrastructure (including the 12km EHV transmission line) are included in the Annex II of the EIA Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), being screened in by the competent authority. Therefore, an EIA had to be performed. The projects, included the EHV transmission line, have already obtained the necessary environmental authorisation (Resolucion de la direccion General de Calidad y Evaluacion Ambiental y Medio Natural) in November 2017. The authorisation procedure and compliance with EU EIA, Birds and Habitats directives will be assessed in detail at the appraisal, in particular for what concerns cumulative impacts and impacts on protected flora and fauna, including any Natura 2000 site.

    Lien vers la source
    Fiche récapitulative

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - IBERDROLA NUNEZ DE BALBOA PV
    Date de publication
    13 juil. 2019
    Langue
    Sujet général
    Prêts
    Numéro du document
    94273343
    Thématique du document
    Information Environnementale
    Numéro du projet
    20180584
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Environmental and Social Completion Sheet - IBERDROLA NUNEZ DE BALBOA PV
    Date de publication
    10 nov. 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    154470702
    Thématique du document
    Information Environnementale
    Numéro du projet
    20180584
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Évaluation des incidences environnementales et sociales - IBERDROLA NUNEZ DE BALBOA PV - ESTUDIO DE IMPACTO AMBIENTAL
    Date de publication
    11 nov. 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    157314064
    Thématique du document
    Information Environnementale
    Numéro du projet
    20180584
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Photogallery

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes