    Unterzeichnung(en)

    Betrag
    145.000.000 €
    Länder
    Sektor(en)
    Spanien : 145.000.000 €
    Energie : 145.000.000 €
    Unterzeichnungsdatum
    11/07/2019 : 145.000.000 €
    Link zum projekt

    Übersicht

    Veröffentlichungsdatum
    8 Mai 2019
    Projektstatus
    Referenz
    Signed | 11/07/2019
    20180584
    Projekttitel
    Projektträger – Finanzintermediär
    IBERDROLA NUNEZ DE BALBOA PV
    IBERDROLA SA
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 145 million
    EUR 290 million
    Ort
    Sektor(en)
    • Energie - Electricity, gas, steam and air conditioning supply
    Beschreibung
    Ziele

    The project consists of the financing of the Nunez de Balboa photovoltaic (PV) Plant (391 MWac) located in the Spanish region of Extremadura.

    The proposed operation aims at financing a 426 MW solar PV plant in the Spanish region of Extremadura (convergence region). As requested by the client, the operation will be labeled as EIB Green Loan, as it is fully eligible under the Climate Awareness Bond (CAB) programme. Iberdrola is one of the most relevant players in the Green Bond market and has for long time requested the EIB to provide green labelling to its financial toolkit whenever possible, given the Bank's very high standards in terms of environmental protection and climate action as well as its prominent role in the Sustainable Financing market via the CAB programme. The operation will be structured as a senior loan to Iberdrola Financiación S.A., the financial subsidiary of the Group, with a parent guarantee provided by Iberdrola S.A., in line with previous operations with the counterpart.

    Umweltaspekte
    Auftragsvergabe

    The plant and its ancillary infrastructure (including the 12km EHV transmission line) are included in the Annex II of the Environmental Impact Assessment (EIA) Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), being screened in by the competent authority. Therefore, an EIA had to be performed. The projects, including the extra high voltage (EHV) transmission line, have already obtained the necessary environmental authorisation (Resolucion de la direccion General de Calidad y Evaluacion Ambiental y Medio Natural) in November 2017. The authorisation procedure and compliance with EU EIA, Birds and Habitats directives will be assessed in detail at the appraisal, in particular for what concerns cumulative impacts and impacts on protected flora and fauna, including any Natura 2000 site. The project site land (of approximately 943 Hectares) has been already fully secured through a 25-year lease agreement, whereas land acquisition process of the land required for the transmission line is awaiting a Declaration of Public Utility by the relevant authority and expropriation may be needed. Land acquisition procedures will be further assessed at appraisal, to ensure full compliance with the Bank's Environmental and Social Standards. The main commercial risk for the project will be the uncertainty on the revenues, which will depend on: (i) the final terms and conditions of the Power Purchase Agreement (PPA), (ii) the residual exposure to the wholesale market prices and (iii) the intrinsic uncertainty associated with the production of PV plants. Those elements will be assessed in detail at the appraisal. Other risks, to be further assessed at the appraisal, will be: (iv) delay during implementation (v) environmental risks connected with a project of such extension

    The promoter is a public utility operating in a liberalised market and the project has not applied to any subsidy or participated in renewable energy auctions and, therefore the project is subject to a private procurement regime. The public tenders for the supply of the main equipment and services have been already ran and awarded. The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU and 2014/25/EU, where applicable, as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required. The project has almost completed its permitting phase: the Construction Permits have been obtained from the competent municipalities in June and July 2018, whereas the Administrative Authorisation (Autorizacion Administrativa de Costruccion y Declaracion de Utilidad Publica) is expected by the end of 2018. The project has also been granted grid connection pre-authorisation (contestacion de acceso y remision) in May 2018. As for the environmental aspects, the plant and its ancillary infrastructure (including the 12km EHV transmission line) are included in the Annex II of the EIA Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), being screened in by the competent authority. Therefore, an EIA had to be performed. The projects, included the EHV transmission line, have already obtained the necessary environmental authorisation (Resolucion de la direccion General de Calidad y Evaluacion Ambiental y Medio Natural) in November 2017. The authorisation procedure and compliance with EU EIA, Birds and Habitats directives will be assessed in detail at the appraisal, in particular for what concerns cumulative impacts and impacts on protected flora and fauna, including any Natura 2000 site.

    Link zum projekt

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - IBERDROLA NUNEZ DE BALBOA PV
    Datum der Veröffentlichung
    13 Jul 2019
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    94273343
    Thema
    Umweltinformationen
    Projektnummer
    20180584
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen
    Environmental and Social Completion Sheet - IBERDROLA NUNEZ DE BALBOA PV
    Datum der Veröffentlichung
    10 Nov 2022
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    154470702
    Thema
    Umweltinformationen
    Projektnummer
    20180584
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen
    Umwelt- und Sozialverträglichkeitsprüfung - IBERDROLA NUNEZ DE BALBOA PV - ESTUDIO DE IMPACTO AMBIENTAL
    Datum der Veröffentlichung
    11 Nov 2022
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    157314064
    Thema
    Umweltinformationen
    Projektnummer
    20180584
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Photogallery

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen