Fiche récapitulative

Date de publication
13 mai 2022
Statut
Référence
Signé | 21/07/2022
20210785
Nom du projet
Promoteur – Intermédiaire financier
PONT ET BARREAU DE CAMELAT
AGGLOMERATION D'AGEN
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 30 million
EUR 70 million
Lieu
Secteur(s)
Description
Objectifs

The project consists of the construction of a new 3 km road section between the N21 (on the right bank of the Garonne River) and the D119, directly connected to the new motorway interchange on the A62 (Agen Ouest), which is part of the Atlantic Core Network Corridor. The road is a single carriageway (1+1 lanes) with a separated bi-directional path for cyclists and pedestrians. It includes a bridge over the Garonne River, and a viaduct crossing the side channel to the Garonne River. The project also includes the re-meandering and revegetation of existing artificial ditches within the road corridor.

The project aims at completing the Agen western bypass, by connecting the N21 to A62 Trans-European Transport Network (TEN-T) motorway. This will notably allow to open up the south-east part of the Département du Lot-et-Garonne. The road will form an essential link for the "Agen Rive Gauche" economic zone and forms an integral part of the Sustainable Urban Mobility Plan (SUMP) of the agglomeration.

Additionality and Impact

Le projet améliore la connectivité tant urbaine que régionale et contribue à la cohésion sociale et économique de l'Aquitaine, une région en transition. Il remédie à la faible accessibilité du réseau central RTE-T. Le projet améliorera la cohésion territoriale et la connectivité intermodale (gare TGV prévue, réseau de transport urbain), contribuant ainsi au rééquilibrage modal et à la réduction des embouteillages dans l'agglomération d'Agen. Grâce à la réduction de la distance parcourue sur le corridor nord-sud et au détournement du trafic hors du centre-ville, les effets induits des transports seront réduits. L'intégration d'infrastructures sûres pour les cyclistes et les piétons dès le stade de la conception est susceptible d'encourager le transfert modal dans la zone concernée et de contribuer à l'atténuation des changements climatiques. Le Coût d'Investissement du Projet peut relever à plus de 15 % de l'action pour le climat.

Le prêt de la BEI complétera la subvention accordée par l'État dans le cadre du Plan de relance ainsi que la subvention consentie par le département du Lot-et-Garonne. Il permet en effet à l'Agglomération d'étaler son effort de financement tout en payant, dans des délais normaux, chacune des entreprises intervenant sur ce chantier.

 

Le financement à long terme accordé par la BEI contribuera à rendre l'investissement plus rentable pour l'emprunteur (étant donné que cette contrepartie n'a pas facilement accès à une telle association de durée, délai de grâce, flexibilité en matière de tirage et tarification) et il contribuera à diversifier ses sources de financement.


Aspects environnementaux
Passation des marchés

The project falls under Annex II of the Directive 2011/92/EU as amended by Directive 2014/52/EU and subject to environmental impact assessment (EIA) as decided by the competent authority. The project has received the public-interest utility declaration (DUP) and environmental authorisation from the prefecture of Lot-et-Garonne on February 11, 2022. The project intersects the "Garonne in New Aquitaine" Natura 2000 site under the amended Habitats Directive (92/43/EC). Appropriate avoidance, mitigation and compensation measures were determined, including fauna/flora protection, noise reduction measures, landscaping and reforestation as well as water protection measures. The project is considered to be aligned with the low carbon goal as it consists of large new road capacity infrastructure construction meeting the EIB eligibility criteria for Transport. No residual environmental impact is expected if all the identified avoidance, reduction and compensation measures are properly implemented.

The Promoter is a public contracting authority subject to the relevant EU directives. The procurement procedures for all major works contracts were launched between the fourth quarter of 2021 and the first quarter of 2022 through an open tender after international publications in the Official Journal of the EU (OJ ref. 567502-2021 amended by 636930-2021 and 572942-2021 amended by 643287-2021). Their award is expected in April 2022. There has been no claim or complaint from tenderers or other contractors, and there are no legal processes pending.

Lien vers la source
Fiche récapitulative

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Évaluation des incidences environnementales et sociales - PONT ET BARREAU DE CAMELAT - Link to EIA report
Date de publication
27 Jun 2022
Langue
Sujet général
Prêts
Numéro du document
158350076
Thématique du document
Information Environnementale
Numéro du projet
20210785
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Évaluation des incidences environnementales et sociales - PONT ET BARREAU DE CAMELAT - Résumé Non Technique
Date de publication
20 Jul 2022
Langue
Sujet général
Prêts
Numéro du document
156038993
Thématique du document
Information Environnementale
Numéro du projet
20210785
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Fiche technique sur les aspects sociaux et environnementaux - PONT ET BARREAU DE CAMELAT
Date de publication
21 Jul 2022
Langue
Sujet général
Prêts
Numéro du document
153196829
Thématique du document
Information Environnementale
Numéro du projet
20210785
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes