Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20010734
Date de publication: 6 juin 2002

Promoteur – Intermédiaire Financier

Transco plc
130 Jermyn Street
London SW1Y 4UR
UK
Contact Point: Malcolm Cooper

Lieu

Description

The project intends to expand the gas transmission and distribution networks in the UK to meet future demand as well as to improve the operational safety of gas transmission systems and reduce gas losses. The proposed loan finances part of a capital expenditure programme, which has recently been agreed with the industry regulator. Investments will include the accelerated mainsreplacement programme requested by the Health and Safety Executive.

Objectifs

The project is aimed at aiding the promoter to meet peak capacity requirements for the transmission and distribution of natural gas and to fulfill legal and regulatory requirements regarding safety and the environment. In particular, the project is designed to result in improved safety and reliability of the supply network, to cater for demand growth, and reduce greenhouse gas emissions and technical losses.

Commentaires

Oil and gas

Secteur(s)

Montant BEI envisagé (montant approximatif)

GBP 200 million (EUR 326 mio)

Coût total (montant approximatif)

Estimated to be about GBP 1,500 mio for the period 2002-04.

Aspects environnementaux

The schemes included in the project fall under Annex II of Directive 97/11/EC. The promoter has confirmed that Environmental Impact Assessment (EIA) procedures are carried out where required by the competent authorities and mitigating measures are applied as appropriate.

Passation des marchés

The programme falls under the Procurement Directive 93/38/EC and its amendment 98/4/EC. The promoter has confirmed to fully comply with its requirements. Advertising and notices are regularly placed in the Official Journal where appropriate. Companies are pre-qualified and contracts are usually awarded using restricted and negotiated procedures.

Statut

Signé - 31/05/2002

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Royaume-Uni Énergie