The proposed project consists in constructing and operating a 425 MWe Combined Cycle Gas Turbine (CCGT) unit Soto 5 of efficiency 58%. The unit will be built at Soto de Ribera, Asturias Province, in North West Spain, 8 km from Oviedo, on an established industrial site, next to the already operating similar generation facility Soto 4.

Objectifs

The project is located in a convergence (phasing out) region and, due to the deployment of advanced gas-fired combined cycle technology, will result in efficient electricity generation with lower environmental impact than coal/lignite power stations. It will contribute to meeting growing demand thus increasing energy security and diversify power generation at Iberian and European levels.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Estimated at EUR 140 million.

Coût total (montant approximatif)

Estimated at EUR 280 million.

Aspects environnementaux

Due to its capacity (plant over 300 MWth), the project is subject to the Annex 1 of the EIA Directive (85/337/EC and amendments) and was required to undergo a full Environmental Impact Assessment. The EIA covering both units Soto 4 (already commissioned) and Soto 5 was approved in December 2005 and a construction permit for both units was granted by the competent authority. The details of the EIA, results of public consultation and proposed mitigation measures as well as investment’s potential impact on nature conservation sites, will be reviewed during appraisal.

Passation des marchés

The project promoter has confirmed that it is subject to the EU legislation on procurement. The contract was announced in the OJEU dated 25/10/2002. Details of the procurement procedure will be fully investigated during appraisal.

Statut

Signé - 22/07/2010

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Espagne Énergie