Referenz: 20090240
Veröffentlichungsdatum: 15 Juni 2009

Projektträger – zwischengeschaltetes Finanzinstitut

EDP - Energias De Portugal, S.A.

Ort

Beschreibung

The proposed project consists in constructing and operating a 425 MWe Combined Cycle Gas Turbine (CCGT) unit Soto 5 of efficiency 58%. The unit will be built at Soto de Ribera, Asturias Province, in North West Spain, 8 km from Oviedo, on an established industrial site, next to the already operating similar generation facility Soto 4.

Ziele

The project is located in a convergence (phasing out) region and, due to the deployment of advanced gas-fired combined cycle technology, will result in efficient electricity generation with lower environmental impact than coal/lignite power stations. It will contribute to meeting growing demand thus increasing energy security and diversify power generation at Iberian and European levels.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Estimated at EUR 140 million.

Gesamtkosten (voraussichtlicher Betrag)

Estimated at EUR 280 million.

Umweltaspekte

Due to its capacity (plant over 300 MWth), the project is subject to the Annex 1 of the EIA Directive (85/337/EC and amendments) and was required to undergo a full Environmental Impact Assessment. The EIA covering both units Soto 4 (already commissioned) and Soto 5 was approved in December 2005 and a construction permit for both units was granted by the competent authority. The details of the EIA, results of public consultation and proposed mitigation measures as well as investment’s potential impact on nature conservation sites, will be reviewed during appraisal.

Auftragsvergabe

The project promoter has confirmed that it is subject to the EU legislation on procurement. The contract was announced in the OJEU dated 25/10/2002. Details of the procurement procedure will be fully investigated during appraisal.

Projektstatus

Unterzeichnet - 22/07/2010

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Energie