Date de publication: 3 août 2012
Promoteur – Intermédiaire Financier
Syndicat Mixte des Transports en Commun de l'AgglomérationGrenobloise (SMTC Grenoble)Lieu
Description
The project consists of the construction of a fifthtramway line (line E) connecting Grenoble to its suburb ofFontanil-Cornillon (north-west).
Objectifs
Line E is the main plank of the Urban Transport Plan and forms part of apolicy of sustainable urban development in the greater Grenoble area.This large-scale project in the Grenoble conurbation addresses two basic issues:- it improves public transport access to greater Grenoble from the Voreppe valley in the north;- it strengthens the coordination between public transport provision and the urban development of the districts served.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 145 million
Coût total (montant approximatif)
EUR 290 million
Aspects environnementaux
The project comes under Annex II to the Directive 2011/92/EU, so the need to conduct an environmental impact assessment (EIA) is determined by criteria laid down by the Member States. According to French legislation, the project is subject to an impact assessment. The project obtained a favourable opinion from the environmental authority and was declared as being in the public interest in September 2011. All environmental aspects will be examined in greater detail during the final project appraisal.
Passation des marchés
As a public entity, SMTC must comply with public procurement procedures under French law resulting from the transposition of Community directives. The Bank will require the promoter to ensure that the contracts for the implementation of the project have been/are awarded in accordance with current EU legislation.
Statut
Signé - 28/10/2014
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).