Référence: 20150008
Date de publication: 18 septembre 2017

Promoteur – Intermédiaire Financier

SOCIETE NATIONALE INDUSTRIELLE ET MINIERE

Lieu

Description

The project consists of the dredging works related to the deepening and enlargement of the access channel to the Port of Nouadhibou solid bulk terminal, where iron ore from the Société Nationale Industrielle et Minière (SNIM) production facilities is handled. The project will allow bigger vessels to berth at the SNIM terminal increasing the environmental sustainability of the supply chain associated to SNIM's business model.

Objectifs

The project consists of the capital dredging works related to the deepening and enlargement of the access channel to the Port of Nouadhibou solid bulk terminal, where iron ore from the SNIM production facilities is handled. The project will allow bigger vessels to berth at the SNIM terminal increasing the operational efficiency and environmental sustainability of the supply chain associated to the business model of SNIM. The construction is expected to last a total of 14 months.

Commentaires

The Borrower is a repeat and long-term client of the EIB.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 50 million

Coût total (montant approximatif)

EUR 119 million

Aspects environnementaux

If within the EU, the project would fall under Annex I of the EIA Directive 2011/92/EU and would require a full Environmental Impact Assessment (EIA). In compliance with these requirements, an environmental and social impact assessment (ESIA) is being prepared and public consultations shall be undertaken. Once the ESIA is approved by the environmental authority, an enhanced Environmental and Social Management Plan (ESMP) will also be prepared. During the appraisal process the Bank will check the compliance of the above mentioned procedures and documents with the EIB's environmental and social standards.

Passation des marchés

The Bank will require the promoter to ensure that all contracts for the implementation and operation of the project have been or shall be tendered in accordance with the Bank's Guide to Procurement. Procurement procedures and status for the various project components will be checked in detail during the appraisal process.

Statut

Signé - 28/06/2018

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Mauritanie Transports