Date de publication: 24 septembre 2015
Promoteur – Intermédiaire Financier
Ministry of Regional Development and InfrastructureLieu
Description
Development of a new highway alignment along the E-60 East-West Highway and, specifically, the 14 km section between Zemo Osiauri and Chumateleti. The project is part of the European route E-60, which is the second-longest European road corridor running from France to Kyrgyzstan. In Georgia, it runs from the Red Bridge at the Azerbaijan Border to the Poti Port at the Black Sea Coast, a distance of about 388 km.
Objectifs
The construction of this section of the East-West corridor will contribute to the development of trade, regional integration and interconnectivity, which are important factors for economic growth, progress and social transformation.
Commentaires
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 49 million
Coût total (montant approximatif)
EUR 176 million
Aspects environnementaux
If the project was located in the EU, it would fall under Annex I of Environmental Impact Assessment (EIA) Directive 2011/92/EC. An EIA (and a resettlement action plan) is being done. During appraisal the Bank will review the EIA process to confirm that it complies with applicable domestic legislation, the principles laid out in the EU directives and any other relevant international conventions to which the Republic of Georgia is party, including an assessment of any cross-border impact of the project on the environment (ESPOO Convention).
Passation des marchés
The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules. The calls for tender and the award notices will be published in the Official Journal of the EU as appropriate.
Statut
Signé - 11/02/2016
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).