Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20170089
Date de publication: 31 août 2018

Promoteur – Intermédiaire Financier

PUBLIC ENTITY(IES)

Lieu

Description

The project concerns the capacity increase and treatment level upgrade of the Alexandria West Wastewater Treatment Plant (WWTP).

Objectifs

The objectives of the operation are: (i) environmental protection and depollution, (ii) improving public health, and (iii) promoting sustainable economic development. First, the primary objective of the operation is to bring environmental benefits to the project area through the sustainable disposal or utilisation of effluent and sludge, sustainable water resources management, and the depollution of Lake Maryut and the Mediterranean Sea. Second, the project will improve the public health situation in Alexandria by improving water quality and reducing pollution. Third, the project is expected to lead to positive economic externalities by, for example, improving the economic situation for fisheries and tourism in the area.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Garantie au titre du MPE

This operation is covered by the ELM Guarantee.

Montant BEI envisagé (montant approximatif)

EUR 140 million

Coût total (montant approximatif)

EUR 185 million

Aspects environnementaux

The project is anticipated to contribute towards efficient and sustainable water resources management in Egypt as well as to the Egyptian climate protection efforts. In addition, it is expected to have substantial environmental and social benefits, as it will reduce the levels of pollution in Lake Maryout, El Mex Bay and the Mediterranean Sea. Any potential adverse environmental and social impacts are site-specific and can be prevented and/or readily minimised through appropriate mitigation measures and by adhering to globally recognized performance standards, guidelines, and/or design criteria, including EIB environmental and social principles, standards and practices.

Passation des marchés

The EIB will require the promoter to ensure that the implementation of the project will be done in accordance with EIB's Guide to Procurement.

Statut

Signé - 31/12/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Égypte Eau, assainissement