Référence: 20180104
Date de publication: 26 octobre 2018

Promoteur – Intermédiaire Financier

ENEL GREEN POWER ESPANA SL

Lieu

Description

The project consists of the implementation of wind power renewable energy generation projects (490MW) and solar photovoltaic generation projects (342MW) awarded to the company in the recent Spanish auction, to be constructed in the 2018-2019 period.

Objectifs

The present operation will contribute to the achievement of Spanish 2020 targets for renewable energy and to the reduction of the Carbon dioxide (CO2) emissions.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 335 million

Coût total (montant approximatif)

EUR 703 million

Aspects environnementaux

Both wind and solar plants fall within the Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), and have been screened in, requiring a full EIA including public consultation, while one wind farm, with capacity of 8 MW has been screened out, but has anyway undergone environmental impact studies (one as old as 2008 and another one to be completed by September 2018) provided with an environmental study. The permitting and land acquisition processes are ongoing for most plants. Detailed assessment of environmental and social issues, as well as of compliance with the Bank Environmental and Social standards, will be performed at the appraisal.

Passation des marchés

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions . However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/25/EU or 2004/17/EC, where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation Directive 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 21/12/2018

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.