Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20180104
Release date: 26 October 2018

Promoter – Financial Intermediary

ENEL GREEN POWER ESPANA SL

Location

Description

The project consists of the implementation of wind power renewable energy generation projects (490MW) and solar photovoltaic generation projects (342MW) awarded to the company in the recent Spanish auction, to be constructed in the 2018-2019 period.

Objectives

The present operation will contribute to the achievement of Spanish 2020 targets for renewable energy and to the reduction of the Carbon dioxide (CO2) emissions.

Sector(s)

  • Energy - Electricity, gas, steam and air conditioning supply

Proposed EIB finance (Approximate amount)

EUR 335 million

Total cost (Approximate amount)

EUR 703 million

Environmental aspects

Both wind and solar plants fall within the Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), and have been screened in, requiring a full EIA including public consultation, while one wind farm, with capacity of 8 MW has been screened out, but has anyway undergone environmental impact studies (one as old as 2008 and another one to be completed by September 2018) provided with an environmental study. The permitting and land acquisition processes are ongoing for most plants. Detailed assessment of environmental and social issues, as well as of compliance with the Bank Environmental and Social standards, will be performed at the appraisal.

Procurement

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions . However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/25/EU or 2004/17/EC, where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation Directive 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the EU Official Journal, as and where required.

Status

Signed - 21/12/2018

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Spain Energy