Référence: 20190336
Date de publication: 15 janvier 2021

Promoteur – Intermédiaire Financier

EDP RENOVAVEIS SA

Lieu

Description

Renewable energy programme promoted by EDP Renováveis Brasil S.A., comprised of a 260 MWp solar photovoltaic (PV) plant in the state of Sao Paulo, as well as 260 MW in two onshore wind plants in the state of Rio Grande do Norte. The operation is proposed as a sub-operation under the framework loan LATAM sustainable power generation FL (2017-0468).

Objectifs

The project consists of up to three renewable energy plants in Brazil with a combined capacity of 260 MW in the State of Rio Grande do Norte (North-East) and a 260 MWp solar photovoltaic plant in the State of São Paulo (Centre-South). The project scope also includes the interconnection facilities.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

not disclosed

Coût total (montant approximatif)

not disclosed

Aspects environnementaux

If located in the EU, these plants would be included in Annex II of the EIA Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), requiring the environmental authority to screen and decide whether an environmental impact assessment (EIA) process is mandatory. Similarly, the interconnection lines would be also be included in the same annex in the case of the PV plant. In the case of the wind farms, the shared 500 kV would be included in Annex I of the abovementioned directive, requiring an EIA to be performed.

Passation des marchés

The Promoter, an affiliate of a European private utility, is a private entity that does not benefit from special and exclusive rights in these operations, and is therefore subject to a private procurement regime. The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the EIB's Guide to procurement. In particular, the Bank will prohibit that any local requirement or local preference applies.

Statut

Approuvé - 16/07/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).