Veröffentlichungsdatum: 15 Januar 2021
Projektträger – zwischengeschaltetes Finanzinstitut
EDP RENOVAVEIS SAOrt
Beschreibung
Renewable energy programme promoted by EDP Renováveis Brasil S.A., comprised of a 260 MWp solar photovoltaic (PV) plant in the state of Sao Paulo, as well as 260 MW in two onshore wind plants in the state of Rio Grande do Norte. The operation is proposed as a sub-operation under the framework loan LATAM sustainable power generation FL (2017-0468).
Ziele
The project consists of up to three renewable energy plants in Brazil with a combined capacity of 260 MW in the State of Rio Grande do Norte (North-East) and a 260 MWp solar photovoltaic plant in the State of São Paulo (Centre-South). The project scope also includes the interconnection facilities.
Sektor(en)
- Energie - Energieversorgung
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
not disclosed
Gesamtkosten (voraussichtlicher Betrag)
not disclosed
Umweltaspekte
If located in the EU, these plants would be included in Annex II of the EIA Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), requiring the environmental authority to screen and decide whether an environmental impact assessment (EIA) process is mandatory. Similarly, the interconnection lines would be also be included in the same annex in the case of the PV plant. In the case of the wind farms, the shared 500 kV would be included in Annex I of the abovementioned directive, requiring an EIA to be performed.
Auftragsvergabe
The Promoter, an affiliate of a European private utility, is a private entity that does not benefit from special and exclusive rights in these operations, and is therefore subject to a private procurement regime. The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the EIB's Guide to procurement. In particular, the Bank will prohibit that any local requirement or local preference applies.
Projektstatus
Genehmigt - 16/07/2020