Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20190336
Veröffentlichungsdatum: 15 Januar 2021

Projektträger – zwischengeschaltetes Finanzinstitut

EDP RENOVAVEIS SA

Ort

Beschreibung

Renewable energy programme promoted by EDP Renováveis Brasil S.A., comprised of a 260 MWp solar photovoltaic (PV) plant in the state of Sao Paulo, as well as 260 MW in two onshore wind plants in the state of Rio Grande do Norte. The operation is proposed as a sub-operation under the framework loan LATAM sustainable power generation FL (2017-0468).

Ziele

The project consists of up to three renewable energy plants in Brazil with a combined capacity of 260 MW in the State of Rio Grande do Norte (North-East) and a 260 MWp solar photovoltaic plant in the State of São Paulo (Centre-South). The project scope also includes the interconnection facilities.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

not disclosed

Gesamtkosten (voraussichtlicher Betrag)

not disclosed

Umweltaspekte

If located in the EU, these plants would be included in Annex II of the EIA Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), requiring the environmental authority to screen and decide whether an environmental impact assessment (EIA) process is mandatory. Similarly, the interconnection lines would be also be included in the same annex in the case of the PV plant. In the case of the wind farms, the shared 500 kV would be included in Annex I of the abovementioned directive, requiring an EIA to be performed.

Auftragsvergabe

The Promoter, an affiliate of a European private utility, is a private entity that does not benefit from special and exclusive rights in these operations, and is therefore subject to a private procurement regime. The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the EIB's Guide to procurement. In particular, the Bank will prohibit that any local requirement or local preference applies.

Projektstatus

Genehmigt - 16/07/2020

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Brasilien Energie