    Référence: 20230188
    Date de publication: 14 juin 2023

    Promoteur – Intermédiaire Financier

    NOVO ENERGY PRODUCTION AB

    Lieu

    Description

    The project concerns the construction and operation of a production facility for advanced lithium-ion batteries for electric vehicles to be located in Gothenburg. The site will have a yearly production capacity of 35 million cells or up to 17.5 GWh of battery capacity being produced from one downstream block and associated facilities integrated into one building.

    Objectifs

    The aim is to make a substantial contribution to the development of a competitive EU-based battery industry while enabling the development of the European electric vehicles (EV) industry. Additionally, the project will support the transition to e-mobility, by meeting the growing demand for EV batteries in Europe with cutting-edge battery cell.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    USD 500 million (EUR 458 million)

    Coût total (montant approximatif)

    USD 2233 million (EUR 2047 million)

    Aspects environnementaux

    As an integrated industrial plant, the project falls under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending Directive 2011/92/EU requiring a full EIA process. An EIA Report has been produced, presented for public consultation and the full environmental permit is expected to be issued by the Competent Authority in the Summer of 2023. During appraisal the EIB will review the EIA process and documents, as well as compliance with EU Directives for the protection of Habitats and Birds, respectively.

    Passation des marchés

    The promoter is a private entity not operating in the utilities sector, thereby not obligated to follow public procurement procedures.

    Statut

    Approuvé - 21/03/2024

    Milestone
    À l'examen
    Approuvé
    21 mars 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Suède Industrie