ELECTRICITY DISTRIBUTION SLOVENIA - LJUBLJANA

Unterzeichnung(en)

Betrag
50.000.000 €
Länder
Sektor(en)
Slowenien : 50.000.000 €
Energie : 50.000.000 €
Unterzeichnungsdatum
24/07/2024 : 50.000.000 €
Link zum projekt

Übersicht

Veröffentlichungsdatum
8 Mai 2024
Projektstatus
Referenz
Unterzeichnet | 24/07/2024
20230907
Projekttitel
Projektträger – Finanzintermediär
ELECTRICITY DISTRIBUTION SLOVENIA - LJUBLJANA
ELEKTRO LJUBLJANA PODJETJE ZA DISTRIBUCIJO ELEKTRICNE ENERGIJE DD
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 50 million
EUR 164 million
Ort
Sektor(en)
Beschreibung
Ziele

Support for the Electro Ljubljana's investment programme in its regional electricity distribution network over the period 2024-2026. This includes network reinforcements and refurbishments in high, medium and low voltage, targeting at maintaining the quality of supply, integration of renewable energy generation, catering for peak demand growth, as well as climate-proofing part of the network.

The programme will enable the promoter to maintain high quality of services and low losses across its electricity distribution network, connect new end-users and renewable energy generators as well as climate-proofing part of the network. The programme supports the 2030 targets set in the country's National and Energy Climate Plan (with regards to the integration of RES), as well as EU policies on energy and climate, by enhancing critical infrastructure for decarbonisation.

Additionality and Impact

The Project supports the modernization, reinforcement and digitalisation of the electricity distribution network infrastructure in Slovenia, in the Central Sava, Southeast Slovenia and Central Slovenia regions. EIB's financing of the investment Programme will enable the Promoter to replace assets that have reached the end of their lifetime while increasing capacity in a context of expected increase of electricity demand. The Project will improve quality of service, reliability and security of supply that have public good attributes. Moreover, the electricity network investments will increase the hosting capacity of renewables and enable increased electrification, thereby enabling a reduction of negative climate and environmental externalities. The project will contribute to achieving Slovenia Long-Term Climate 2050 Strategy adopted in July 2021, the National Energy and Climate Plan (NECP) and EU fit-for-55 policy and targets.


In line with the EU Taxonomy, electricity grid infrastructure in Europe is considered eligible for classification as an activity contributing to climate change mitigation. The financing of this Project is in line with the Bank's lending priority objectives on energy as well as the transversal objectives on Climate Action. The Project is expected to deliver good economic benefits and good social benefits. The Promoter is experienced in works of this nature and has a sound project management system in place. 


The EIB support to this operation is expected to provide tangible value-added benefit, positively contributing to the Promoter's capital-intensive investments by offering more flexible terms compared to the commercial banks. EIB's involvement provides a flexible financial product to the borrower including flexible drawdowns, availability period and long tenors. The EIB loan also allows the Borrower to diversify its financing sources.



Umweltaspekte
Auftragsvergabe

Some programme schemes may fall under Annex II of Directive 2014/52/EU, amending the EIA Directive 2011/92/EU thus requiring a review by the competent authorities at the planning/consent stage with due regard to the necessity for environmental impact assessments.

The Bank will require the Promoter to ensure that contracts for implementation of the project have been and shall be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
28 Juni 2024
24 Juli 2024

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - ELECTRICITY DISTRIBUTION SLOVENIA - LJUBLJANA
Datum der Veröffentlichung
4 Jul 2024
Sprache
Bereich
Finanzierung
Nummer des Dokuments
210796752
Thema
Umweltinformationen
Projektnummer
20230907
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Aktuelles und Storys

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdemechanismus

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

Weitere Veröffentlichungen