Veröffentlichungsdatum: 20 November 2003
Projektträger – zwischengeschaltetes Finanzinstitut
EGNATIA ODOS S.A.
Contact: Mrs Papassiopi
Ort
Beschreibung
The proposed project consists of the design and construction of three sections of the central-eastern Egnatia road axis (TEN project) concerning in total 158km of motorway constructed as a dual carriageway 24,5m wide with 2 traffic lanes per carriageway, including a considerable amount of tunnels, bridges and interchanges. The project shall link major sections of the Egnatia road axis already financed by the Bank.
Ziele
The proposed project, forming part of the ongoing implementation of the Egnatia road axis, will link the sections already operating. The completion of the Egnatia road axis shall provide substantial time-savings and greatly assist private and commercial transport in the area of northern Greece and the Balkans and shall connect Turkey to central Europe through a high standard motorway.
Kommentar(e)
Regional Development and Infrastructure of European Interest.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 400 m.
Gesamtkosten (voraussichtlicher Betrag)
Estimated at EUR 900 m.
Umweltaspekte
The Bank requires of the Promoter to fully comply will all relevant EU legislation in the field of the environment.
Auftragsvergabe
The Bank requires of the Promoter to fully comply with the provisions of the relevant EU procurement legislation.
Projektstatus
Unterzeichnet - 30/01/2004
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).