The proposed project consists of the design and construction of three sections of the central-eastern Egnatia road axis (TEN project) concerning in total 158km of motorway constructed as a dual carriageway 24,5m wide with 2 traffic lanes per carriageway, including a considerable amount of tunnels, bridges and interchanges. The project shall link major sections of the Egnatia road axis already financed by the Bank.
Objectifs
The proposed project, forming part of the ongoing implementation of the Egnatia road axis, will link the sections already operating. The completion of the Egnatia road axis shall provide substantial time-savings and greatly assist private and commercial transport in the area of northern Greece and the Balkans and shall connect Turkey to central Europe through a high standard motorway.
Commentaires
Regional Development and Infrastructure of European Interest.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 400 m.
Coût total (montant approximatif)
Estimated at EUR 900 m.
Aspects environnementaux
The Bank requires of the Promoter to fully comply will all relevant EU legislation in the field of the environment.
Passation des marchés
The Bank requires of the Promoter to fully comply with the provisions of the relevant EU procurement legislation.
Statut
Signé - 30/01/2004
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).