Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20100407
Veröffentlichungsdatum: 19 Januar 2011

Projektträger – zwischengeschaltetes Finanzinstitut

Nottingham City Council

Ort

Beschreibung

Extension to Nottingham's existing urban light rail network, through the addition of two new lines serving the western and southwestern areas of the city. The two new tram routes will link densely populated urban areas and key commercial districts to the city centre. The project is being procured as a 23-year DBFOM (Design-Build-Finance-Operate & Maintain) concession, which will include taking over the existing NET Line One route, which has been successfully operating since 2004.

Ziele

Reducing road congestion and supporting economic growth and regeneration in the Greater Nottingham area.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

GBP 100 million

Gesamtkosten (voraussichtlicher Betrag)

GBP 600 million

Umweltaspekte

Urban tramway projects fall under Annex II of the EU Directive 85/337/EEC as amended and therefore competent authorities decide on the requirement of an EIA. In this case the competent authority decided that an EIA is required. The project is contributing to reduce reliance on private cars and the negative impact of transport on the environment, thus contributing to climate change objectives. These details along with compliance with EU Birds and Habitat Directives will be examined during the project appraisal.

Auftragsvergabe

The Promoter is subject to and follows EU procurement procedures (namely, Directive 2004/18/EC) including publication in the EU Official Journal. Project components financed by the Bank will be/have been tendered in accordance with the Public Contracts Regulations 2006 which implement the Directive in England, Wales and Northern Ireland. Under these circumstances, the procurement procedures applied by the Promoter are suitable for the project and acceptable to the Bank. The project will be procured as a PPP, through a negotiated procedure with two bidders after a prequalification procedure. Appraisal will give extra attention to risks and risk transfers. Full details will be checked at appraisal stage.

Projektstatus

Unterzeichnet - 15/12/2011

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Vereinigtes Königreich Verkehr