Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20100670
Veröffentlichungsdatum: 31 März 2011

Projektträger – zwischengeschaltetes Finanzinstitut

Acquedotto Pugliese S.p.A.

Ort

Beschreibung

The project concerns the investment programme under the Master Plan, for the 2010-2012 period. The investments will mainly concern small to medium sized water and wastewater facilities and will be aimed at (i) reducing water losses, (ii) increasing the availability of water resources and (iii) expanding the water and wastewater networks and plants.

Ziele

The project will contribute to meeting the requirements of the Urban Waste Water Treatment Directive and the Water Framework Directive. The resulting improved service standards and higher resilience to the effects of climate change qualify the operation as relevant for climate action.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to EUR 150 million

Gesamtkosten (voraussichtlicher Betrag)

Up to EUR 370 million

Umweltaspekte

Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 97/11/EC, as amended by Directive 2003/35/EC, will be respected. The promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the EIA. In addition, for any part of the scheme that may impact on a nature conservation site, the promoter will be required to provide to the Bank information on the mitigating measures needed to comply with the Habitats Directive.

Auftragsvergabe

The Bank will require from the promoter that contracts for the implementation of the project have been or shall be tendered in accordance with relevant EU procurement laws (2004/17/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

Projektstatus

Unterzeichnet - 30/11/2012

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Italien Wasser, Abwasser