Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20150325
Veröffentlichungsdatum: 24 Juni 2015

Projektträger – zwischengeschaltetes Finanzinstitut

ROMANIA

Ort

Beschreibung

The project concerns drinking water treatment and distribution, as well as wastewater collection and treatment, located in Neamt and Harghita county in Romania.

Ziele

The projects fall under the Romanian National Strategic Reference Framework (NSRF), priority Axis 1 of the Sectorial Operational Programmes (SOP) for Environment for the 2007-2013 programming period. This programme is financed by the Structural Programme Loan NSRF Cofinancing Facility. The purpose of the project is to achieve compliance with EU drinking water and urban wastewater directives as well as to promote greater sustainability in water services and resource management.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 16 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 120 million

Umweltaspekte

All projects comprising rehabilitation and development of networks in smaller agglomerations fall under Annex II of the Environmental Impact Assessment (EIA) Directive and were screened out by the competent authority. The results of the EIA process were reviewed by DG Environment.

Auftragsvergabe

The promoter, Regional Operating Company, responsible for public procurement, is subject to EU public procurement regulations (Directive 2004/17/EC for utilities). The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Genehmigt - 26/02/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Rumänien Wasser, Abwasser