Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20160946
Veröffentlichungsdatum: 20 März 2017

Projektträger – zwischengeschaltetes Finanzinstitut

CHO POWER

Ort

Beschreibung

The project covers the development, installation, operation and maintenance of a 10MW biomass and waste gasification plant in Thouars, France. The facility will turn waste and biomass into electricity and heat thanks to a gasification process using plasma torch technology developed by CHO Power.

Ziele

The project will contribute to environmental protection. It will also contribute to achieving EU and French renewable energy objectives, especially those relating to the Loi de Transition Energétique pour la Croissance Verte (Energy Transition for Green Growth Act) targeting the phasing-out of landfill and the use of non-recyclable waste for energy recovery. The proposed operation is therefore eligible for EIB financing under the EU Treaty Article 309 c) common interest (Protection of environment and energy/renewable energy).

Sektor(en)

  • Müllbeseitigung - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 30 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 65 million

Umweltaspekte

Due to its technical characteristics the project is subject to a mandatory environmental impact assessment (EIA). An EIA including public consultation was issued on 16 August 2016 by the relevant authorities. The project will contribute to environmental protection. The plan's current basic design suggests that proven air pollutant abatement technologies will be implemented. This comes along with a high energy conversion efficiency compared to thermal process. It contributes to climate change objectives by reducing direct greenhouse gas emissions from biowaste and by substituting the use of natural gas of fossil origin.

Auftragsvergabe

The promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions.

Projektstatus

Unterzeichnet - 27/03/2018

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Frankreich Müllbeseitigung