Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20190324
Veröffentlichungsdatum: 21 Oktober 2019

Projektträger – zwischengeschaltetes Finanzinstitut

LAO PEOPLE'S DEMOCRATIC REPUBLIC

Ort

Beschreibung

The proposed framework loan is expected to finance road rehabilitation works in Laos to maintain and improve connectivity and accessibility and to improve their climate resilience. The project will include road sections that require urgent rehabilitation as their current condition hampers economic development and access to public services.

Ziele

The proposed framework loan is expected to finance road rehabilitation works in Laos to maintain and improve connectivity and accessibility and to improve their climate resilience. The project will include road sections that require urgent rehabilitation as their current condition hampers economic development and access to public services.

Sektor(en)

Garantie im Rahmen des Außenmandats

This operation is covered by the ELM Guarantee.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 108 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 398 million

Umweltaspekte

An Environmental and Social Management Framework is being prepared for the NR13 and it will be assessed to what extent this framework can apply for all schemes under the proposed framework loan. Gender issues will also be considered, to ensure that the road designs take into account the needs of various user groups. The projects under this framework loan will also improve the climate resilience of the roads and thus contribute to Climate Action.

Auftragsvergabe

It will be required that the promoter ensures that implementation of the project will be done in accordance with the EIB's Guide to Procurement.

Projektstatus

Unterzeichnet - 20/12/2019

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Laos Verkehr