Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20210614
    Veröffentlichungsdatum: 14 März 2023

    Projektträger – zwischengeschaltetes Finanzinstitut

    Not disclosed.

    Ort

    Beschreibung

    The project concerns the construction and deployment of a submarine cable system in the black sea interconnecting Europe with the Caucasus (Poti, Georgia) and then Armenia through an existing terrestrial infrastructure to be upgraded. The system will be operated on an open access basis , subject to local regulations, it will have a total length of 1 163km.

    Ziele

    The main objective of the project is to provide connectivity between Europe and South Caucasus with higher quality of service (lower latency) and high capacity.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 20 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 45 million

    Umweltaspekte

    In general, the deployment of telecommunication infrastructures have limited environmental effects, apart from minor disturbances during construction, which can be properly mitigated by applying industry-standard measures. For the specific case of submarine cables, the cable landings are usually subject to environmental studies for their approval. This can vary depending on the jurisdiction. As per the assessment performed within the EU, where and if applicable, the requirements of the Environmental Impact Assessment Directive (EIA) 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC or the equivalent national regulation will be verified during appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Projektstatus

    In Prüfung - 4/08/2022

    Milestone
    In Prüfung

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Armenien Georgien Telekommunikation