    The project relates to the deployment of a new FTTH (fibre-to-the-home) access network in areas of Poland where very high capacity networks are not available, which will pass 2.1 million households and business premises. The new network will be operated on a wholesale basis selling services with equal terms and conditions to all retail operators.

    Ziele

    The project is fully in line with the "EU Digital Compass 2030," stating that by 2030 all EU households should have Gigabit connectivity. Therefore, the project is eligible under article 309 point (a) projects for developing less developed regions, for eligible parts, and point (c), Common Interest. Regarding the Bank's Public Policy Goals, the project contributes to Research Innovation and Digital-Rollout of ultra-high speed broadband networks and economic and social cohesion for eligible parts.

    Kommentar(e)

    It envisaged that EIB will provide a loan of up to PLN 825 million.

    Sektor(en)

    Umweltaspekte

    Investments in fixed telecommunications projects do not fall under Annex I or II of the EIA Directive 2014/52/EU amending the Directive 2011/92/EU. Fixed telecommunications systems have limited environmental effects, apart from disturbances during civil work constructions, which will be mitigated by appropriate measures. Moreover, the Promoter is planning to re-use as much as possible existing infrastructure to minimise the need for civil works. Full environmental details will be assessed during appraisal.

    Auftragsvergabe

    The Promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the Promoter is subject to EU public procurement legislation, then the Bank would duly inform the Commission Services and would require the Promoter to apply those rules.

    Projektstatus

    Unterzeichnet - 27/12/2022

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Telekommunikation