    Referenz: 20220558
    Veröffentlichungsdatum: 29 November 2023

    Projektträger – zwischengeschaltetes Finanzinstitut

    SOCIETATEA NATIONALA NUCLEARELECTRICA SA

    Ort

    Beschreibung

    The project concerns the design and construction of a tritium removal facility to improve radiation safety at the nuclear power plant.

    Ziele

    The aim is to remove radioactive tritium from reactor coolant and moderator and consequently to reduce radiation exposure of personnel, the radioactivity level of controlled releases and the amount of radioactive waste. After removal of tritium the reactor coolant and moderator can be safely reused. Therefore, the project will improve radiation safety, operational efficiency and environmental sustainability of the power plant, as well as occupational and public health and safety. It will allow simplified and more efficient planning and execution of regular maintenance works, the planned refurbishments and the final decommissioning of the nuclear units. Shortening the outage periods would result in incremental electricity production. In addition, the removed tritium as a rare radioactive isotope has significant strategic value as a critical material needed in the development process of another promising low-carbon power generation technology, nuclear fusion. Tritium is also required for some emerging technologies to produce nuclear medicine isotopes.

    Sektor(en)

    • Energie - Energieversorgung
    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 145 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 316 million

    Umweltaspekte

    The project has been subject to an Environmental impact assessment (EIA) process including public consultations and the transboundary context. The potential impacts associated with the project include construction health and safety, hazardous materials and waste, workers exposure to harmful impacts, community impacts and stakeholder engagement. However, with mitigation measures implemented, including good construction practice measures, monitoring and remedial actions the effects on environment are not considered significant. The environmental benefits of the project include reduction of radioactivity level of controlled releases, amount of radioactive waste, and radiation exposure of personnel. The decision of the competent authority was issued in January 2023.

    Auftragsvergabe

    The promoter is a state-owned company operating in utilities sector (electricity). The Bank required the promoter to ensure procurement of the contracts for implementation of the project in accordance with the applicable EU public procurement legislation with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 22/12/2023

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    15 November 2023
    22 Dezember 2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Rumänien Energie Wasser, Abwasser