Veröffentlichungsdatum: 4 September 2024
Projektträger – zwischengeschaltetes Finanzinstitut
CEZ DISTRIBUCE ASOrt
Beschreibung
An investment programme for CEZ Distribuce's electricity distribution network in Czechia over the period 2025-2026. The programme includes investments in the reinforcement and refurbishment of medium and low voltage networks.
Additionality and Impact
The programme comprises investments in the electricity distribution network in the Czech Republic over the period 2025-2026. It addresses the needs for the renewal of existing assets and planned development, including automation and tele-control. The programme contributes to maintaining or increasing security of supply by reducing the risk of supply interruptions, and it contributes to the integration of low-carbon generation and thus reduces carbon and air pollution externalities.
The investments contribute to achieving EU and national targets, as set out in the 2030 National Energy and Climate Plan of Czechia. 100% of the programme will benefit Cohesion regions in the Czech Republic.
The programme has good economic rate of return and social benefit and generates additional employment in construction. The capacity of the promoter is considered appropriate for the proposed project. The financing will also have an important signalling effect in times when energy companies face significant financing needs. Long tenor and flexible financing conditions (drawdown and repayment flexibility) provided by the Bank will help the Promoter in achieving the investment objectives.
Ziele
The project caters for demand growth, the connection of network users, the integration of renewables, and the improvement of the quality of service and the efficiency of operations.
Sektor(en)
- Energie - Energieversorgung
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 800 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 1402 million
Umweltaspekte
The project includes components that may fall under Annex II of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an environmental impact assessment (EIA). The impacts that can be typically expected for some schemes relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction.
Auftragsvergabe
The Bank will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Projektstatus
Unterzeichnet - 29/11/2024
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).