    Amount
    € 150,000,000
    Countries
    Sector(s)
    Vietnam : € 150,000,000
    Transport : € 150,000,000
    Signature date(s)
    6/12/2010 : € 150,000,000
    Link to source

    Summary sheet

    Release date
    18 May 2010
    Status
    Reference
    Signed | 06/12/2010
    20090250
    Project name
    Promoter - financial intermediary
    Ho Chi Minh City Metro Line Project 2

    Ho Chi Minh City People’s Committee

    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    Up to EUR 150 million.
    EUR 1.7 billion.
    Location
    Sector(s)
    Description
    Objectives

    The project consists of the first phase of Metro Line 2 in Ho Chi Minh City, Vietnam’s largest and most important city together with Hanoi. The new line will be approximately 11.7 km long (including connection to depot), with 11 stations and a depot/workshop. The project foresees also the acquisition of new rolling stock to operate the line. The project is part of the approved Transport Master Plan, which includes other new metro lines, and aims to achieve a significant increase in public transport modal share, from the current 5% to more than 40%. This will help in mitigating transport-related pollution in this increasingly congested city. The projected is to be implemented over the period 2011-2018.

    The proposed operation would support a project that would contribute to the EU presence in Vietnam through transfer of technology and know-how and to environmental sustainability, the two objectives of the Asia Latin America Mandate and EU priorities.

    Environmental aspects
    Procurement

    By virtue of its technical characteristic, the project, if located in the EU, would fall under Annex II of the EU EIA Directive 85/337/EEC as amended, leaving it up to the competent authorities to decide whether an EIA is required or not. Under Vietnamese Law, a full EIA, including public consultation, is required and has been conducted by the promoter, assisted by international consultants under the supervision of the Asian Development Bank. Its content and main findings will be reviewed in depth at appraisal stage. The project and the more global plan of which it is part should greatly reinforce the public transport system in HCMC, thus pushing for a positive modal shift from private cars, reducing congestion and environmental problems associated to it, including the reduction of greenhouse gases emissions, and therefore contributing to Climate Change mitigation.

    The project would have to comply with the basic principles of the EU policy on procurement. These aspects will be checked during appraisal. Nevertheless, it is already clear that the main project components will be internationally tendered according to principles indicated by the different IFIs involved in the project, consistently with the principles of EIB’s Guide to Procurement, the application of which is a precondition for the Bank’s financing. Tender documentation and all the procurement process for components financed by the EIB will be subject to its approval and the release of no-objection before proceeding.

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications